Submit Comments
View Comments
 




Holcomb-Naselle Line Rebuild 2019



The following comments were submitted in response to the open comment period described below.

Comments are numbered consecutively as they are received. Breaks in the number sequence result when comments are deleted because they were submitted in error or have inappropriate content (such as SPAM). If you do not see your comment two business days after you submit it, please contact (800) 622-4519.

Project Manager and Technical Lead

For More Information:
https://www.bpa.gov/efw/Analysis/NEPADocuments/nepa/Holcomb-Naselle%20Transmission%20Line%20Rebuild/Holcomb-Naselle_EA_3A_DEA_Public_Letter.pdf

Close of comment:  9/20/2019

  • HNLRB19190001 -  Nelson

  • HNLRB19190002 -  Gradt

  • HNLRB19190003 -  Goss/Washington Dept of Natural Resources


Vulnerability Disclosure Program

If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel.